![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Find-A-Pro | Member Login | Contact PDCA | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Standard Name and Description |
File Format |
|
Introduction to the PDCA Standards |
||
Download All PDCA Standards in a Zip Compressed Folder Permission and Use License, Introduction to the PDCA Standards and all PDCA Standards - PDF format in Zip Compressed Folder |
||
Standard - PDCA P1-04 Establishes criteria for determining a properly painted surface, defines touch up and repair, and determines which party to an agreement should bear the financial responsibility for such work. |
||
Standard - PDCA P2-04 Establishes criteria for determining the qualifications and responsibilities of third parties charged with conducting inspections of coatings application work performed by painting and decorating contractors, as well as the procedures to be followed by inspectors in the performance of their duties. The establishment of “inspection hold points” by all parties to the agreement are an important part of this standard. |
||
Standard - PDCA P3-04 Describes the impact on the costs associated with and time required to complete a project as the number and placement of paint colors and types of finishes grow. The standard is intended to provide guidance in those instances where the number and placement of paint colors and color ranges are either not specified in the bid documents or are unclear. |
||
Standard - PDCA P4-04 Establishes criteria for determining which of the parties to an agreement has responsibility for inspecting and approving surfaces prior to their being painted or decorated. |
||
Standard - PDCA P5-04 Establishes a procedure for the submission and approval of benchmark samples which will serve to determine achievable quality from specified preparation, paint and coating systems. |
||
Standard - PDCA P6-04 Establishes criteria for determining the acceptance of completed wallcovering installations and defines the responsibilities of the parties to an agreement. |
||
Standard - PDCA P7-04 Establishes criteria for the order of work performed by various parties on a construction project as it relates to the efficient and successful completion of painting and decorating work. The cost impact of variations from a prescribed schedule are discussed. |
||
Standard - PDCA P8-04 Establishes the contracting entity’s responsibility maintenance of painted and coated surfaces and prescribes procedures and financial responsibilities for inspecting and repainting previously painted surfaces that have since become aesthetically less pleasing in appearance. |
||
Standard - PDCA P9-04 Defines terms commonly used to describe work to be performed by painting and decorating contractors in the routine and ordinary course of their duties. This standard clarifies the work scope and responsibilities of the painting and decorating contractor. |
||
Standard - PDCA P10-04 Prescribes a methodology for measuring surfaces for estimating and bidding painting and decorating work. |
||
Standard - PDCA P11-05 Defines painter's caulk to determine its suitability and establish its placement whether delineated, implied and/or not referenced in the specification for painting. |
||
Standard - PDCA P12-05 Establishes consistent procedures for the specification of block filling and the application of block filler prior to painting paint grade smooth face concrete masonry units. |
||
Standard - PDCA P13-06 Establishes the inspection and acceptance of architectural paints on the interior surfaces of structures when dry film thickness is specified |
||
Standard - PDCA P14-06 Identifies and describes various levels of surface preparation for repainting and maintenance projects receiving architectural coatings |
||
Standard - PDCA P15-07 Establishes procedures for the evaluation of shop primer applied by an entity other than the painting contractor. |
||
Standard - PDCA P16-07 Assigns responsibilities to the various entities involved when wallcovering is removed by an entity other than the Painting and Decorating Contractor in preparation for painting. |
||
| Standard - PDCA P17-08 Assigns responsibilities to the various entities involved when smooth faced tilt-up concrete is field painted. |
||
Standard - PDCA P18-08 Define criteria for the documentation of extra work to a contract for painting and decorating. Assigns financial responsibilities to the various entities involved when extra work is performed to a contract for painting and decorating work. |
||
PDCA Technical Paper 100 |
||
Responsibilities and Limitations Regarding Efflorescence In Masonry, Stucco, and Cementitious Substrates |
||
Find-A-Pro Contractor College PACE2009 Industry Vendors Shop PDCA
Contact PDCA | Join PDCA | PDCA Standards | Member Login | PDCA Store | News & Articles | PDCA Privacy Policy